The Activities that HWE is conducting on this project (so far) are as follows:
1. Environmental Studies (including Ecological Investigations) of the Wastewater Treatment Plant and Sewerage Collection System for Al Yamoun.
2. Environmental Studies (including Ecological Investigations) of the Wastewater Treatment Plant and Sewerage Collection System for Qabatya.
3. Environmental Studies (including Ecological Investigations) of the Wastewater Treatment Plant and Sewerage Collection System for Y’bad.
4. Environmental Studies (including Ecological Investigations) of the Wastewater Treatment Plant and Sewerage Collection System for Azzoun.
5. Environmental Studies (including Ecological Investigations) of the Wastewater Treatment Plant and Sewerage Collection System for Tarqumiya.
6. Environmental Studies (including Ecological Investigations) of the Wastewater Treatment Plant and Sewerage Collection System for Dura.
7. Conducting Surveys for the Sewerage Collection System and for the site of the Wastewater Treatment Plant for Al Yamoun.
8. Conducting Surveys for the Sewerage Collection System and for the site of the Wastewater Treatment Plant for Qabatya.
9. Conducting Surveys for the Sewerage Collection System and for the site of the Wastewater Treatment Plant for Y’bad.
10. Conducting Surveys for the Sewerage Collection System and for the site of the Wastewater Treatment Plant for Azzoun.
11. Conducting Surveys for the Sewerage Collection System and for the site of the Wastewater Treatment Plant for Tarqumiya.
12. Conducting Surveys for the Sewerage Collection System and for the site of the Wastewater Treatment Plant for Dura.
13. Designing (with Black & Veatch) the Sewerage Collection System for Al Yamoun.
14. Designing (with Black & Veatch) the Sewerage Collection System for Qabatya.
15. Designing (with Black & Veatch) the Sewerage Collection System for Y’bad.
16. Designing (with Black & Veatch) the Sewerage Collection System for Azzoun.
17. Designing (with Black & Veatch) the Sewerage Collection System for Tarqumiya.
18. Designing (with Black & Veatch) the Sewerage Collection System for Dura.
19. Designing (with Black & Veatch) the Wastewater Treatment Plant for Al Yamoun.
20. Designing (with Black & Veatch) the Wastewater Treatment Plant for Qabatya.
21. Designing (with Black & Veatch) the Wastewater Treatment Plant for Y’bad.
22. Designing (with Black & Veatch) the Wastewater Treatment Plant for Azzoun.
23. Designing (with Black & Veatch) the Wastewater Treatment Plant for Tarqumiya.
24. Designing (with Black & Veatch) the Wastewater Treatment Plant for Dura.
25. Developing Wastewater Re-use plans for Irrigation for Al Yamoun.
26. Developing Wastewater Re-use plans for Irrigation for Qabatya.
27. Developing Wastewater Re-use plans for Irrigation for Y’bad.
28. Developing Wastewater Re-use plans for Irrigation for Azzoun.
29. Developing Wastewater Re-use plans for Irrigation for Tarqumiya.
30. Developing Wastewater Re-use plans for Irrigation for Dura.
Reports
Qabatia Wastewater System Environmental
Scoping Statement
Al Yamoun Wastewater System Environmental
Scoping Statement
Ya'bad Wastewater System Environmental
Scoping Statement
Azzoun Wastewater System Environmental
Scoping Statement
Dura Wastewater System Environmental Scoping
Statement
Tarqumiya Wastewater System Environmental
Scoping Statement
|